Enerpac has gained unique expertise in delivering hydraulic solutions for the controlled movement and positioning of structures.
Lift and Weigh of a Jack-Up Rig Cantilever and Drill Floor
Lamprell has completed the fabrication of a new jack-up drilling rig. Every jack-up rig cantilever and drill floor needs to be accurately weighed after construction. Space restrictions under the cantilever prevented the use of other weighing systems without costly rework to the load structure. Enerpac distributor Al Masaood Trading, based in Dubai, was asked to provide a safe, accurate and compact solution for weighing the jack-up rig cantilever and drill floor.
Öl und Gas
Enerpac JS-250 for Aertssen Cranes Bridge Deck Installation
Aertssen Cranes was tasked with first positioning two abutments, each weighing 350 tonnes, and then installing the bridge deck, over a weekend.
Infrastructure
Enerpac JS-250 Jack-Up System Deployed for Bridge Removal
The extension of Runway B at Narita Airport required the creation of a new grade-separated intersection between the Higashi-Kanto Expressway and the extended section of Runway B.
Infrastructure
Placement of 1,140 ton Nuclear Plant Module with a SyncHoist System
South Carolina Electric & Gas Company (SCE&G), principle subsidiary of SCANA Corporation, and Georgia Power were both working on nuclear generation station expansion projects in their respective states. SCE&G was tasked to place a 2.4 million pound CA01 module in the first of two new nuclear plants at the V.C. Summer nuclear generating station in Jenkinsville, South Carolina. Georgia Power was placing the same module for Unit 3 at the Plant Vogtle nuclear expansion.
Stromerzeugung
Leak Free Connections on Critical Joints with Hydraulic Tensioners
The maintenance teams at the Wallumbilla Gas Treatment Facility were assembling several gas processing and treatment pipelines. Each flange bolt required a precise amount of tension in order to ensure a leak free connection.
Öl und Gas
Safe and Quiet Axle Correction with a Pneumatic Torque Wrench
AxleFix performs wheel alignments and axle corrections on large trucks, trailers, buses and even smaller trailers nation-wide. Correct alignments can greatly extend tyre life, improve fuel efficiency make the overall drive smoother.
Automotive
Offloading a 1,300 ton Hydrocracker
Beluga was tasked with offloading a hydrocracker weighing 1,306 tons from a barge and bringing it onshore. Due to the weight and length of the hydrocracker utilizing a crane was not an option.
Petrochemikalien
Lifting a Historic Building for Renovation
Renovation of a historic building in Georgia's capital required the foundation to be repaired after it had sunk into the ground. The 100-year-old building needed to be lifted 3.4 meters onto pylons in order to be renovated.
Infrastruktur
Strand Jacks Smart Cylinder Control System Enable Safe and Synchronous Lowering of Shaft Lining for Underground Mine
The proper installation of shaft lining is crucial to the safety of mine workers.
Mining
SyncHoist Lifts and Positions Brisbane Riverwalk Concrete Girders
Building a 850m pedestrian riverwalk required pre-cast concrete girders weighing 385 tons to be lifted and positioned into place.
Brücken
Jacking & Skidding a Tunnel Boring Machine for the Next Drilling Phase
In 2013, Jakarta, the capital city of Indonesia, broke ground on a mass rapid transit (MRT) system in hope to alleviate the city’s traffic congestion. The rail-based MRT is expected to stretch across over 108 kilometers. A tunnel boring machine (TBM) is being used to construct the underground routes. One of the critical phases of the tunnel construction is the pass through, in which the TBM needs to be moved through the underground stations to be relocated to the next drilling position.
Infrastruktur